On November 15th in the afternoon, zhongjian steel structure in 2012 labor

On November 15th in the afternoon, zhongjian steel structure in 2012 labor workshops held in the center of the wuhan project. Ye Guoxin zhongjian steel structure, deputy general manager, the relevant departments and sub branch labor servicesmanagementRelated leaders, labor servicesmanagement21 and qualified subcontracting enterprise on behalf of a total of more than 80 people attended the meeting. Meeting invited build three innings engineering Tang Daobin draw service center director, vice general manager RuanAiJun to attend. Conference aims to prepare for one year service management work, strengthen the cooperation with various service units and the exchange, mutual understanding and mutual trust, promote the company to further improve the service management.

Meeting through data analysis, emphatically explores zhongjian rockwool sandwich panel and labor service coope ration situation, for the current company in labor management & other Upgrade management, process reengineering & throughout; Direction, and to build better cooperation of labor service platform, form a more harmonious labor cooperation environment, consolidate with individual labor subcontractor's & other; Throughout, development partners, cooperation friend &; Relationship has laid a solid foundation.

Meeting content is rich, to build steel structure development needs. On the basis of the work report by the company and the various units, new & other; Overseas projects throughout project report &; Various labor service cooperation partners, encouraging them to participate in the development of overseas projects, with the company development pace, speed up to & other; International & throughout; Move; At the same time, through & other; Labor comments & throughout; Reflect the company's emphasis on labor management and company continuous improvement in service management.

Conference, which led to the company's service workshops gave high evaluation, and for the next step work points out: the labor resources construction should be continuously strengthened, focus on the cultivation of the core services; Second, we must pay special attention to the servicestandardConstruction, and promote service informatization pace; Third, we need to do a good job of labor service and coordination, the establishment of labor two-way appraisal system; Four labor management system to strengthen the construction, to ensure that the service work into effect; Five should further perfect the labor service cooperation environment, make joint efforts to promote effective improvement of the cooperation issues and problems; Six to do real, do fine labor management, efforts to set up the labor management & other; Benchmarking & throughout; . At the same time, it also requires cooperation of labor service enterprises to strengthen self-construction, want to have a mature management system and management team, must have certain assets, etc.

Zhongjian 、rockwool sandwich panel www.jingtabuilding.com, deputy general manager of Ye Guoxin respectively from the angles of sub branch and labor units made important instructions. Request each branch, to intensify the building of labor, improve the quality of cooperation services; Second, we must standardize the management, improve project performance BaoZhangLi; Third, we need to adhere to the people-oriented, increase service security work; Fourth, we need to strengthen communication, enhance mutual understanding and trust. Requires cooperation of labor service enterprises, to firm the confidence of the cooperation and development; Second, we must make great efforts to improve its strength; Third, we need to strengthen the performance responsibility consciousness; Fourth, we need to accelerate transformation against marketpolicyRisk.

2013年9月26日星期四

On November 16th, supplies of equipment engineering company of guizhou cloud horse aircraft factory 4 48 m span truss hoisting success workshop

On November 16th, supplies of equipment engineering company of guizhou cloud horse aircraft factory 4 48 m span truss hoisting success workshop, the guizhou co., LTD., deputy general manager zhang liang to live visit the hoisting process.

48 m span truss department installed plant located in 4 lines to 14 to 24 / C axis & steel structure workshop; The Z axis, truss rods for weldingh-beamEaves, 48 m, span truss height of 16.85 m, the roof height is 18.05 m, truss single weight of 12 tons, is the largest span truss anshun area, belong to more than a certain size of greater danger division component project. Equipment materials engineering company attaches great importance to for the project, the special organization of engineering and technical personnelThe construction of thelan, and organizeexperts, fromThe construction of steel structure workshop www.jingtabuilding.com to processing components to the truss hoisting people accountable for results. At 8 in the morning and in the professional direction, the two 50 tons of automobile crane slowly rises, 20 minutes after truss firmly, 48 m span truss hoisting success.

Jiangsu taizhou changjiang river highway bridge is expected to officially opened to traffic in late November

http://steelstructurewarehouse.blogspot.com/2013/09/jiangsu-taizhou-changjiang-river.html

2013年9月21日星期六

Linxia highway in shandong province since taking S2 line Kang Lin

Linxia highway in shandong province since taking S2 line Kang Lin) in, highway guardrail plate, fully strengthen the routine inspections, maintenance and management of the highway, a comprehensive guarantee for highway safety, especially for the highway waveform barrier plate plate collision damage in severe and the maintenance cost is wire mesh fence than highways atonement for standard, bought maintenance wave beamGuardrail plateBoard of commonly used equipment, technical personnel carefully study, quickly master the use of equipment and maintenance essentials, waveform after repairGuardrail plateBasically reached the professional maintenance team level, at the same time, greatly reduce the maintenance cost, from professional maintenance team need to nearly 600 yuan per meter now dropped to 400 yuan, the basic close to the highway atonement for standard. Damage in freeway traffic safety facilities, the total period of time limit in accordance with the relevant provisions in a timely manner to repair damaged infrastructure change. Try to reduce the number of traffic facilities repair to the negative influence of driving, did it increases with the increasing bad repair, safety facilities to ensure the facility is wire mesh fence www.jtwiremesh.com, marked and in good condition, effective guarantee the driving safety. According to the statistics, which this year change, correction of wave beam guardrail plate of 1536 meters, replace the anti-dazzle 2398 boards, anti-glare board bracket 270, precast reinforced concrete isolation column 600 root, repair the barbed wire police 23532 meters.

October 2 at noon, took place in G25 high-speed lotus is a van crashed into togetherGuardrail

http://steelstructurewarehouse.blogspot.com/2013/09/october-2-at-noon-took-place-in-g25.html

2013年9月17日星期二

On August 16 evening, in the 309 national road

On August 16 evening, in the 309 national road, a car knocked guardrail after fleeing. Just witness the whole process of the warm-hearted citizens. Wu call from source to this version, and chain link fencing. Traffic police immediately rushed to the scene and found that 309 national highway guardrail was broken off, three pickets knocked out nearly 20 meters, the ground residual with broken glass and debris. Have been waiting for Mr. Wu said at the scene, and his car is to drive, just witnessed the crash of the whole process. Cars cornering speed very fast, suddenly crashed into a guardrail, knocked down a fence three piles, barriers have been broken off and drag a barrier pile through the yellow line. Fortunately, at that time, no other vehicles through, otherwise the consequences must be more serious. Crashed into a guardrail car paused, then Mr Wu just saw the car license plate, but the owner soon gone, wu shouted parking is useless. After the traffic situation, has carried on the scene forensics take pictures, and ask Mr Wu for the accidents happened in detail. The traffic police, said after the accident, the driver left the scene without reason, will be regarded as hit-and-run.

Because each service area are far apart on the highway

http://steelstructurewarehouse.blogspot.com/2013/09/because-each-service-area-are-far-apart.html

2013年9月16日星期一

Set upGuardrail plateurpose

Set upGuardrail plateurpose: to set the fence is not to reduce the minor accidents. Guardrail of collision avoidance mechanism is throughGuardrail plateAnd vehicles of elastic-plastic deformation, friction, the displacement of the body to absorb the vehicle impact momentum, to achieve the purpose of protecting occupant safety. Railings and welded fence safety facilities is a significant difference between guardrail plate and the vehicle itself damage (deformation) in order to prevent more severe damage to occur. Set up to protect column board to avoid the collision of vehicles and other dangerous objects, also should put the fence as dangerous. That is to say, if a car collided with a certain condition the impact a dangerous accident severity than under the condition of same vehicle crash barrier of accident severity is small, so the danger will not be able to use barrier protection. For example, in a gentle and low cocoon side of the road, cars the way dam accident severity is smaller than vehicle collision fence of accident severity, even happened so many cars on the road accident, also can't use barrier to protect the road, and other security measures should be taken, such as the improvement of road geometry, setting the line of sight induced facilities, speed limit signs are set up and welded fence www.jtwiremesh.com the pavement anti-sliding capacity, etc.

A few days ago, jinhua public assistance center this newspaper office received precision

http://steelstructurewarehouse.blogspot.com/2013/09/a-few-days-ago-jinhua-public-assistance.html

2013年9月15日星期日

Yesterday, which scale jujube expressway in guangxi

Yesterday, which scale jujube expressway in guangxi, a huge truck ran into a high speed along the roadGuardrail plateThe driver was trapped in the car. After the alarm squadron quickly dispatched a tanker, a rescue vehicle, a total of 14 fire officers and soldiers rushed to the scene to chain link fence. Entire cab badly damaged car serious deformation and the car driver was serious deformation of the front card hover on the seat, unable to move. Through inspection, trapped driver just stuck on her leg.
Controller according to the scene reconnaissance, comprehensively carry out emergency rescue. First implement alert, warning vehicles approaching the scene of the accident and avoid secondary accident. Then the commander a conversation with the men, trying to comfort the trapped driver, to stabilize his emotions; A assigned rapid rescue rescue and relief troops arrived. In order to prevent secondary damage to trapped driver, forcible entry side of group save carefully cut, expansion, the deformation of the bridge implementation of forcible entry; Asked repeatedly stranded the chain link fence www.jtwiremesh.com to ease their fears, to better match the rescue work. After unremitting efforts, the rescue space has been widening, at 11, head of the trapped driver was carried on the scene of the are waiting 120 ambulance to hospital treatment.

The urban trafficGuardrail plateEventually will be less and less

http://steelstructurewarehouse.blogspot.com/2013/09/the-urban-trafficguardrail.html

2013年9月12日星期四

Guardrail plateEveryone know

Guardrail plateEveryone know, in fact, he also has some little-known feature, explain it now, I will come for you. Officially entered the scene in jiangxi high speed highway builder. Facing the dangerous part of the construction environment, they have no retreat, grasped the nettle and overcome difficult, be indomitable, pushes dangerous magic, shows the traffic of jiangxi people especially can bear, especially to the spirit of fighting. In A2 standard, a line of the construction site with the jiangxi jiang feng "cut off". To enter each operating point, must build a lateral service road. Bid the project approach, strive to build a more than 4 m wide, the total length of 14.1 km horizontal service road. B2, B3, mark is located in chung, terrain dangerous, cliffs, towering they force in more than 100 meters high hillside built service road. Plus early building construction road, jiangxi high speed highway across the causeway and the service road building construction nearly 200 kilometers, the largest slope up to 60 degrees, the auxiliary bridge construction park fence 10 meter, 585 meters. For construction time, the project department has invested more than 900, ten thousand yuan to jump in front of the construction unit comes into play basic solve the power problem, a lot of construction unit in 1 month after using the external power. & ndash; & ndash; Advance planning, quickly open the work situation. Quickly in order to smoothly carry out the construction, operation, eliminate blind spots, do planning in advance, the project investment of more than 4500 ten thousand yuan, building construction road, the auxiliary bridge ahead of time. After the construction unit comes into play, have also invested heavily to build footpath, successively constructed 31 km horizontal service road, 58 kilometers of longitudinal road, and most of the hardening, can ensure that the rainy season. Chung yi county Wen Ying township within the territory of terrain, geological, soft, and the lack of local stone mountain slag embankment pavement. Construction units and the from 20 kilometers away to a large number of mountain slag filling, and rob before rainy season all park fence www.jtwiremesh.com, B8 bid a unit alone invested more than 100 ten thousand yuan to build service road.

High speedGuardrail platereservative treatment of highway guardrail plate repair method basically has 3 kinds

http://steelstructurewarehouse.blogspot.com/2013/09/high-speedguardrail-platereservative.html

2013年9月11日星期三

Set upGuardrail plateurpose: to set the fence is not to reduce the minor accidents

Set upGuardrail plateurpose: to set the fence is not to reduce the minor accidents. Guardrail of collision avoidance mechanism is throughGuardrail plateAnd vehicles of elastic-plastic deformation, welded fence, the displacement of the body to absorb the vehicle impact momentum, to achieve the purpose of protecting occupant safety. Railings and other safety facilities is a significant difference between guardrail plate and the vehicle itself damage (deformation) in order to prevent more severe damage to occur. Set up to protect column board to avoid the collision of vehicles and other dangerous objects, also should put the fence as dangerous. That is to say, if a car collided with a certain condition the impact a dangerous accident severity than under the condition of same vehicle crash barrier of accident severity is small, so the danger will not be able to use barrier protection. For example, in a gentle and low cocoon side of the road, cars the way dam accident severity is smaller than vehicle collision fence of accident severity, even happened so many cars on the road accident, also can't use barrier to protect the road, and other security measures should be taken, such as the improvement of road geometry, setting the line of welded fence www.jtwiremesh.com, speed limit signs are set up and improve the pavement anti-sliding capacity, etc.

Full name: the wave beam anti-collision steel fence panels

http://steelstructurewarehouse.blogspot.com/2013/09/full-name-wave-beam-anti-collision.html

2013年9月10日星期二

Yesterday afternoon 3 when, 58 minutes

Yesterday afternoon 3 when, 58 minutes, guangzhou panyu new middle school second day Sir LingXinJie (8) classes, between KeKe rest in the third quarter, the radiator on the third floor corridor hurtling Mercedes ran to the chain link fencing, security stainless steel guardrail rupture suddenly, LingXinJie whilst falling on the first floor, air by emergency invalid perish. Family questioned stainless steel DiaoLan was bonding with the glue, the reporter on-site interview found that many rust stainless steel DiaoLan HuoDongDian has broken, DiaoLan shake pendulum sway very easily break. New high school is located in the town of panyu new creation within the valley around the saemaul undong, it found field in new high school built a teaching building of the third floor. According to grade, xiao li introduced Mr LingXinJie was old to play in the hallway and furious and conflict suddenly broke into the guardrail, "the fence is broken off. He stretched out his hand to hold, but with guardrail fall all the way up!" Xiao li said, LingXinJie due to head down, fainted on the spot don't wake up, to base a large pool of blood, then 120 ambulance separate on-site emergency intervention, but LingXinJie first-aid invalid perish in the end. , according to uncle liang teacher introduced LingXinJie LingXinJie is Mr. 2 (8) class, is, this year 14 years old, his father is a huangpu district chau island, but he's hukou follow mother in guangzhou stone village. Is at 5 PM the day before receiving Hong more they tell, but when they reached the Hong shed, the baby's body has been removed, so far not seen children bodies. Yesterday morning, reporters separate new school interview, LingXinJie parents and other relatives again separate Hong, LingXinJie mother separated LingXinJie fall at the center of really cry fainting. In, they feel that the first notice was not LingXinJie against Hong regulation rules, but the quality problem of the guardrail, Hong shed should, to a claim. Was introduced according to the families of the dead, LingXinJie height is about 160 cm, reporter at the new school found, at the beginning of level 2 Mr Mostly beyond the 160 cm tall, some are already up to 175 cm, 85 cm high concrete barrier, only equivalent to the height of the bottom, if do not have chain link fencing www.jtwiremesh.com, one might not value can fall.

Often because of the limitation of economic conditions

http://steelstructurewarehouse.blogspot.com/2013/09/often-because-of-limitation-of-economic.html

2013年9月9日星期一

Jingta Wire Mesh is specialized in the production of shandong area biggest barrier board manufacturers

Jingta Wire Mesh is specialized in the production of shandong area biggest barrier board manufacturers, under the  new guardrail plate installation and related considerations
Construction technical personnel familiar with and understand the design drawings and construction specifications related to, and together with the construction personnel to the construction site and design drawings one by one check, find out the construction section of the pile number, all kinds of park fence and the structure barrier set location, at the same time to do a good job of construction equipment and materials comes into play.
2, waveform parapet lofting
(1) lofting, pillar should be according to design drawings, and to interchange, Bridges, channels, culverts, and as the locus of control, such as ranging positioning, can adjust the period of adjusting the spacing, and use the oddment allocation methods dealing with spacing.
(2), for the precise lofting and guarantee the fence line, segment for pile no. Review and closure.
(3), pillar lofting, should investigate the surface state of each pillar position, in case of underground communication pipe, drain, etc., or insufficient depth of a buried culvert top, should adjust some of the pillar position, change the column fixed way.
3, waveform guardrail installation
Column hole
(1), according to the design drawing, and check with coordinated road alignment.
(2) basic information, such as shoulder allows, scoring method is used to set the vertical pile, construction should be accurate positioning, should to the design depth in column into the soil, when into too deep, not only will be post out to correct, and shall pull it all out, after waiting for foundation compaction scored again.
(3), pillar in difficulties, can use drilling method or excavation method column installation. Drilling method is used to install, support material should be the same as the roadbed backfill after positioning, and layered tamping dense filling; Excavation method is used to bury pillar, backfill soil should adopt good materials and hierarchical compaction (each layer thickness is not more than 15 cm), backfill soil compaction degree should not be less than the adjacent undisturbed soil.
(4), set in the structure of fence post, construction general in structure construction concrete base has been completed. Basis using the reserved hole, the hole should be remove sundries, sucking up water accumulation in the hole, will good asphalt coating in the bottom of a hole again, and then put into the post, control the elevation. You can note sand around the pillar. When sand filling must keep the correct position and verticality of the post. After the sand compaction, can use asphalt sealing, prevent the rain water leakage into the hole.
(5), in construction of asphalt pavement section of pillar, column pit from subgrade under the surface 5 cm use same as the roadbed backfill material and hierarchical compaction, the rest part adopts the same as the pavement material backfilling and compaction.
After 6, post installation in place, the horizontal direction and vertical direction to form a smooth line.
All landowners, the end of the gradual guardrail construction, should be stipulated in the design of the coordinates of the strict control of the pillar position, pay attention to the parabolic.
4, waveform girder installation
(1), the wave beam installation, through splice bolts joining together each other, and the connecting bolt is fixed on the column and beam. Wave beam splicing direction is the key to install, construction guarantee lap direction should be consistent with the direction.
(2), the wave beam during the installation process should be continuously adjusted, so the connection bolt and splice bolts should not be tighten too soon, so that during the installation process using waveform beam slotted hole to adjust in time, make it formed a smooth linear, avoid partial concave-convex.
(3), the wave beam top surface when installation should be coordinated with road vertical curve. And check the fence line, when determining the line is straight and smooth, may be the last screw down the bolt.
5, matters needing attention
ile in construction should be prepared to (1), section number to find accurate position. Layout should be accurate, error within the prescribed scope.
(2) pillar construction should strictly seriously, its verticality, spacing, bolt hole position should comply with the requirements, and other size is not in conformity with the requirement to rework immediately, and at the same time, should be strictly in accordance with JTJ074-94 norms for rework.
(3) wave beam, pillar of the component such as the packing and marking shall comply with the terms of GB6725. Purchase fence shall not be in bulk, and shall ensure that in the process of park fence www.jtwiremesh.com, transportation, stacking not make the product deformation and damage. Should be fixed and reliable during the process of transportation, prevent due to turbulence or collision damage to the coating makes the deformation of the components.
(4) when the purchase note wave beam high-strength splice bolts connection of packing and marking shall conform to the relevant provisions of GB/T1231.
5 guardrail construction operations should be careful, and may not damage the pavement under the buried cables, pipes and other facilities.

15, around 8 PM, in HaiMenShi minjiang river road

http://steelstructurewarehouse.blogspot.com/2013/09/15-around-8-pm-in-haimenshi-minjiang.html



2013年9月8日星期日

Is specialized in the production of shandong area biggest barrier board manufacturers

Jingta Wire Mesh Co., ltd. is specialized in the production of shandong area biggest barrier board manufacturers, under the Jingta Wire Mesh Co., ltd. new guardrail plate installation and garden fence
Construction technical personnel familiar with and understand the design drawings and construction specifications related to, and together with the construction personnel to the construction site and design drawings one by one check, find out the construction section of the pile number, all kinds of structure and the structure barrier set location, at the same time to do a good job of construction equipment and materials comes into play.
2, waveform parapet lofting
(1) lofting, pillar should be according to design drawings, and to interchange, Bridges, channels, culverts, and as the locus of control, such as ranging positioning, can adjust the period of adjusting the spacing, and use the oddment allocation methods dealing with spacing.
(2), for the precise lofting and guarantee the fence line, segment for pile no. Review and closure.
(3), pillar lofting, should investigate the surface state of each pillar position, in case of underground communication pipe, drain, etc., or insufficient depth of a buried culvert top, should adjust some of the pillar position, change the column fixed way.
3, waveform guardrail installation
Column hole (1), according to the design drawing, and check with coordinated road alignment.
(2) basic information, such as shoulder allows, scoring method is used to set the vertical pile, construction should be accurate positioning, should to the design depth in column into the soil, when into too deep, not only will be post out to correct, and shall pull it all out, after waiting for foundation compaction scored again.
(3), pillar in difficulties, can use drilling method or excavation method column installation. Drilling method is used to install, support material should be the same as the roadbed backfill after positioning, and layered tamping dense filling; Excavation method is used to bury pillar, backfill soil should adopt good materials and hierarchical compaction (each layer thickness is not more than 15 cm), backfill soil compaction degree should not be less than the adjacent undisturbed soil.
(4), set in the structure of fence post, construction general in structure construction concrete base has been completed. Basis using the reserved hole, the hole should be remove sundries, sucking up water accumulation in the hole, will good asphalt coating in the bottom of a hole again, and then put into the post, control the elevation. You can note sand around the pillar. When sand filling must keep the correct position and verticality of the post. After the sand compaction, can use asphalt sealing, prevent the rain water leakage into the hole.
(5), in construction of asphalt pavement section of pillar, column pit from subgrade under the surface 5 cm use same as the roadbed backfill material and hierarchical compaction, the rest part adopts the same as the pavement material backfilling and compaction.
After 6, post installation in place, the horizontal direction and vertical direction to form a smooth line.
All landowners, the end of the gradual guardrail construction, should be stipulated in the design of the coordinates of the strict control of the pillar position, pay attention to the parabolic.
4, waveform girder installation
(1), the wave beam installation, through splice bolts joining together each other, and the connecting bolt is fixed on the column and beam. Wave beam splicing direction is the key to install, construction guarantee lap direction should be consistent with the direction.
(2), the wave beam during the installation process should be continuously adjusted, so the connection bolt and splice bolts should not be tighten too soon, so that during the installation process using waveform beam slotted hole to adjust in time, make it formed a smooth linear, avoid partial concave-convex.
(3), the wave beam top surface when installation should be coordinated with road vertical curve. And check the fence line, when determining the line is straight and smooth, may be the last screw down the bolt.
5, matters needing attention
ile in construction should be prepared to (1), section number to find accurate position. Layout should be accurate, error within the prescribed scope.
(2) pillar construction should strictly seriously, its verticality, spacing, bolt hole position should comply with the requirements, and other size is not in conformity with the requirement to rework immediately, and at the same time, should be strictly in accordance with JTJ074-94 norms for rework.
(3) wave beam, pillar of the component such as the packing and marking shall comply with the terms of GB6725. Purchase fence shall not be in bulk, and shall ensure that in the process of hoisting, transportation, stacking () not make the product deformation and damage. Should be fixed and reliable during the process of transportation, prevent due to turbulence or collision damage to the coating makes the deformation of the components.
(4) when the purchase note wave beam high-strength splice bolts connection of packing and marking shall conform to the relevant provisions of GB/T1231.
5 guardrail construction operations should be careful, and may not damage the pavement under the buried cables, pipes and garden fence www.jtwiremesh.com。


The collision of vehicles to its, because of the corrugated steelGuardrail plateGood performance and energy absorption

http://steelstructurewarehouse.blogspot.com/2013_09_01_archive.html







2013年9月5日星期四

Has not obtainedThe construction of theStarting and has not obtained a license without permission of pre-sale sales

Has not obtainedThe construction of theStarting and has not obtained a license without permission of pre-sale sales, property management enterprises to stop the realty service & hellip; & pvc coated wire fencing; These illegal behaviors will have a clear specification of finesstandard. Beijing housing and urban and rural construction committee recently released the first batch of administrative penalty discretionstandardInvolved,The construction of theLicense, property management, real estate development, commercial housing salesmanagement, etc., according to the illegal and harmful consequences and other considerations, clear on the fines for decided to apply standard and specifications.

Beijing is built appoint relevant controller introduces, the standard penalty discretion is to carry out the relevant requirements of the state council and the municipal government ShangWeiFa, regulating the administrative penalty discretion, raise the level of administrative law enforcement. Is also to strengthen the integrity, risk prevention, promoting reasonable law enforcement, the safeguard legitimate rights and interests, promote the need of administrative dispute resolving.

The release of the Beijing housing system of urban and rural construction administrative penalty discretion benchmark (a) (try out) ", a total of 17, is the first Beijing housing urban and rural construction system formulated by the administrative penalty discretion benchmark. The chief says, the city living building administrative penalty discretion benchmark system according to & other Mature one batch, introduced a batch & throughout; The principle of gradually introduced. The first batch of discretion benchmark, a total of 17, which involves the construction permits one, real estate development 2, 4 commercial housing sales, property management 10. Law enforcement in the administrative punishment, should fully consider the parties illegal facts, character, plot and the damage degree of the related factors, and press the discretion benchmark divided into 2 to 4 different discretion in gear, the corresponding punishment decision.

For example, the discretion standard, published for & other The construction unit has not obtained a construction license or work-start reports throughout the construction & without approval; Behavior, and according to the circumstances of the illegal consequences, put forward the four gear amount of different punishment standard; For & other; Do not conform to the conditions of commercial housing sales, real estate development enterprise to the buyer the YuDingKuan property fee & throughout; Behavior, according to the charging amount how many, has been clear about the from 10000 yuan to 30000 yuan of the three different punishment standard; For & other; Realty service enterprise to close the service & throughout; Behavior, and according to the circumstances of the illegal consequences, identified 10000 yuan, 50000 yuan, 100000 yuan 3 different punishment standard.

The official pointed out that the creation of discretion benchmark, implementation will be penalized to standardize law enforcement personnel to exercise discretion and pvc coated wire fencing www.jtwiremesh.com, risk prevention, promoting rational law enforcement, the safeguard legitimate rights and interests play a positive role in promoting.

Attachment: the Beijing housing urban and rural construction discretion benchmark system administrative penalty clause (a) (try out)"

If the single criterion for sintering and textlightThe steel structureReally don't have a uniformstandard

http://steelstructurewarehouse.blogspot.com/2013/09/if-single-criterion-for-sintering-and.html

2013年9月4日星期三

Of SNS side slope protective screening active defend net

Of SNS side slope protective screening active defend net, active protection fence panels in the most ordinary the most commonly used to GPS2 type of active network, active protection system is through the use of plant root system and the combination of welded fence, so as to restore the ecological environment, strengthen the slope stability and to promote the degradation of organic pollutants, purify air, reduce noise, a kind of environmental protection system. GPS2 SNS active fence type is the most commonly used in slope protection system is a product. Type: type GPS2 network: DO wire mesh SO / / 08/300 2.2/2.25 * 10.2 wire grille (tensile strength of 1770 mpa, breaking force & gt; 40 kn) support rope, & Phi; 16 system + anchor wire rope & Phi; Horizontal support line 16 + & Phi; 12 vertical support line suture line: & Phi; Eight main protection function: slope reinforcement, inhibition of collapse and weathering flake, slipped down, limiting part or a small amount of rockfall movement range, there are small pieces of falling rocks or soil slopes. Note: double layer mesh (wire rope net + steel grille), anchor length 2 m to 3 m, general pulling force of not less than 50 kn main structural configuration: welded fence www.jtwiremesh.com, wire rope, anchor rope and suture rope, steel wire grid network.

Guardrail plate must be good antirust processing

http://steelstructurewarehouse.blogspot.com/2013/09/guardrail-plate-must-be-good-antirust.html

2013年9月3日星期二

On November 3, 4 PM in pingluo county ma from yinchuan day panther company bus station bought A ticket 4:50 to central city XingRenZhen right

On November 3, 4 PM in pingluo county ma from yinchuan day panther company bus station bought A ticket 4:50 to central city XingRenZhen right, get on the bus after the ma found that the car is by yinchuan to lanzhou, passenger cars, car number for f * * * * * A. According to ma, get on the bus after I heard the conductor said to the driver, "pulled a XingRen, a silver, ten lanzhou." Driving the car parking along the way many times, and the car went fast and slow, in the process of ma feel the car was very uncomfortable, intent on hurry to the destination. That night around 7:40, conductor is called ma, ma out of the window a look, and chain link fencing car in the XingRen high-speed intersection, rather than a town. Ma said haven't to the destination, don't want to get off, and the driver to "ma mou one off at XingRen, highway uneconomic" citing ma out of the car. At this point, the night has come, ma had to climb over highway guardrail, but because it was so dark he accidentally fell down from the highway slope protection, was a stranger to XingRen hospital in a coma, and then transferred to the ningxia medical university general hospital. Through inspection, ma was diagnosed with ruptured spleen, stomach there is hemorrhage, need surgery to remove the spleen, at any time can have life risk. On November 5, the reporter understands to ningxia medical university general hospital, ma still in bed can't get up, and medical expenses have spent 15000 yuan. According to ma, after the fall, he and coach management company to negotiate compensation problem for many times, but have been rejected. Ma engaged in vehicle maintenance and chain link fencing www.jtwiremesh.com for cannot afford to continue the hospitalization expenses, has decided to go home rest. George's wife, told reporters after the ma can no longer be engaged in heavy manual labor, and at any time can have life risk.

Zhejiang quzhou high-speed highways brigade inspectors jiangshan export exchange platform in Beijing highway patrol

http://steelstructurewarehouse.blogspot.com/2013/09/zhejiang-quzhou-high-speed-highways.html

2013年9月1日星期日

No process, no false, real and durable wear resistant welded wire mesh Hype is the disadvantages of the network

No process, no false, real and durable wear resistant welded wire mesh Hype is the disadvantages of the network, a lot of really until become false, false to hype come true. Many consumers are confused in how to select the building materials online, I don't know what kind of chain link fencing www.jtwiremesh.com can be real to abrasion and corrosion resistance to oxidation. This request is not too much, because only good building materials to build a good building, such requirement shall be responsible for yourself, responsible for the whole building. Stainless steel mesh is the upgrade version of chain link fencing, its abrasion resistance, oxidation resistance, corrosion resistance is the sublimation of ordinary material mesh. Don't need to brag about, do not need to hype, used stainless steel mesh welders, welding engineering of building material is stainless steel mesh, all really good.

Mink cage - new mink cage price - mink cage craft anpingxian auspicious peak galvanized welded wire mesh

http://steelstructurewarehouse.blogspot.com/2013/09/mink-cage-new-mink-cage-price-mink-cage.html