2013年9月10日星期二

Yesterday afternoon 3 when, 58 minutes

Yesterday afternoon 3 when, 58 minutes, guangzhou panyu new middle school second day Sir LingXinJie (8) classes, between KeKe rest in the third quarter, the radiator on the third floor corridor hurtling Mercedes ran to the chain link fencing, security stainless steel guardrail rupture suddenly, LingXinJie whilst falling on the first floor, air by emergency invalid perish. Family questioned stainless steel DiaoLan was bonding with the glue, the reporter on-site interview found that many rust stainless steel DiaoLan HuoDongDian has broken, DiaoLan shake pendulum sway very easily break. New high school is located in the town of panyu new creation within the valley around the saemaul undong, it found field in new high school built a teaching building of the third floor. According to grade, xiao li introduced Mr LingXinJie was old to play in the hallway and furious and conflict suddenly broke into the guardrail, "the fence is broken off. He stretched out his hand to hold, but with guardrail fall all the way up!" Xiao li said, LingXinJie due to head down, fainted on the spot don't wake up, to base a large pool of blood, then 120 ambulance separate on-site emergency intervention, but LingXinJie first-aid invalid perish in the end. , according to uncle liang teacher introduced LingXinJie LingXinJie is Mr. 2 (8) class, is, this year 14 years old, his father is a huangpu district chau island, but he's hukou follow mother in guangzhou stone village. Is at 5 PM the day before receiving Hong more they tell, but when they reached the Hong shed, the baby's body has been removed, so far not seen children bodies. Yesterday morning, reporters separate new school interview, LingXinJie parents and other relatives again separate Hong, LingXinJie mother separated LingXinJie fall at the center of really cry fainting. In, they feel that the first notice was not LingXinJie against Hong regulation rules, but the quality problem of the guardrail, Hong shed should, to a claim. Was introduced according to the families of the dead, LingXinJie height is about 160 cm, reporter at the new school found, at the beginning of level 2 Mr Mostly beyond the 160 cm tall, some are already up to 175 cm, 85 cm high concrete barrier, only equivalent to the height of the bottom, if do not have chain link fencing www.jtwiremesh.com, one might not value can fall.

Often because of the limitation of economic conditions

http://steelstructurewarehouse.blogspot.com/2013/09/often-because-of-limitation-of-economic.html

2013年9月9日星期一

Jingta Wire Mesh is specialized in the production of shandong area biggest barrier board manufacturers

Jingta Wire Mesh is specialized in the production of shandong area biggest barrier board manufacturers, under the  new guardrail plate installation and related considerations
Construction technical personnel familiar with and understand the design drawings and construction specifications related to, and together with the construction personnel to the construction site and design drawings one by one check, find out the construction section of the pile number, all kinds of park fence and the structure barrier set location, at the same time to do a good job of construction equipment and materials comes into play.
2, waveform parapet lofting
(1) lofting, pillar should be according to design drawings, and to interchange, Bridges, channels, culverts, and as the locus of control, such as ranging positioning, can adjust the period of adjusting the spacing, and use the oddment allocation methods dealing with spacing.
(2), for the precise lofting and guarantee the fence line, segment for pile no. Review and closure.
(3), pillar lofting, should investigate the surface state of each pillar position, in case of underground communication pipe, drain, etc., or insufficient depth of a buried culvert top, should adjust some of the pillar position, change the column fixed way.
3, waveform guardrail installation
Column hole
(1), according to the design drawing, and check with coordinated road alignment.
(2) basic information, such as shoulder allows, scoring method is used to set the vertical pile, construction should be accurate positioning, should to the design depth in column into the soil, when into too deep, not only will be post out to correct, and shall pull it all out, after waiting for foundation compaction scored again.
(3), pillar in difficulties, can use drilling method or excavation method column installation. Drilling method is used to install, support material should be the same as the roadbed backfill after positioning, and layered tamping dense filling; Excavation method is used to bury pillar, backfill soil should adopt good materials and hierarchical compaction (each layer thickness is not more than 15 cm), backfill soil compaction degree should not be less than the adjacent undisturbed soil.
(4), set in the structure of fence post, construction general in structure construction concrete base has been completed. Basis using the reserved hole, the hole should be remove sundries, sucking up water accumulation in the hole, will good asphalt coating in the bottom of a hole again, and then put into the post, control the elevation. You can note sand around the pillar. When sand filling must keep the correct position and verticality of the post. After the sand compaction, can use asphalt sealing, prevent the rain water leakage into the hole.
(5), in construction of asphalt pavement section of pillar, column pit from subgrade under the surface 5 cm use same as the roadbed backfill material and hierarchical compaction, the rest part adopts the same as the pavement material backfilling and compaction.
After 6, post installation in place, the horizontal direction and vertical direction to form a smooth line.
All landowners, the end of the gradual guardrail construction, should be stipulated in the design of the coordinates of the strict control of the pillar position, pay attention to the parabolic.
4, waveform girder installation
(1), the wave beam installation, through splice bolts joining together each other, and the connecting bolt is fixed on the column and beam. Wave beam splicing direction is the key to install, construction guarantee lap direction should be consistent with the direction.
(2), the wave beam during the installation process should be continuously adjusted, so the connection bolt and splice bolts should not be tighten too soon, so that during the installation process using waveform beam slotted hole to adjust in time, make it formed a smooth linear, avoid partial concave-convex.
(3), the wave beam top surface when installation should be coordinated with road vertical curve. And check the fence line, when determining the line is straight and smooth, may be the last screw down the bolt.
5, matters needing attention
ile in construction should be prepared to (1), section number to find accurate position. Layout should be accurate, error within the prescribed scope.
(2) pillar construction should strictly seriously, its verticality, spacing, bolt hole position should comply with the requirements, and other size is not in conformity with the requirement to rework immediately, and at the same time, should be strictly in accordance with JTJ074-94 norms for rework.
(3) wave beam, pillar of the component such as the packing and marking shall comply with the terms of GB6725. Purchase fence shall not be in bulk, and shall ensure that in the process of park fence www.jtwiremesh.com, transportation, stacking not make the product deformation and damage. Should be fixed and reliable during the process of transportation, prevent due to turbulence or collision damage to the coating makes the deformation of the components.
(4) when the purchase note wave beam high-strength splice bolts connection of packing and marking shall conform to the relevant provisions of GB/T1231.
5 guardrail construction operations should be careful, and may not damage the pavement under the buried cables, pipes and other facilities.

15, around 8 PM, in HaiMenShi minjiang river road

http://steelstructurewarehouse.blogspot.com/2013/09/15-around-8-pm-in-haimenshi-minjiang.html



2013年9月8日星期日

Is specialized in the production of shandong area biggest barrier board manufacturers

Jingta Wire Mesh Co., ltd. is specialized in the production of shandong area biggest barrier board manufacturers, under the Jingta Wire Mesh Co., ltd. new guardrail plate installation and garden fence。
Construction technical personnel familiar with and understand the design drawings and construction specifications related to, and together with the construction personnel to the construction site and design drawings one by one check, find out the construction section of the pile number, all kinds of structure and the structure barrier set location, at the same time to do a good job of construction equipment and materials comes into play.
2, waveform parapet lofting
(1) lofting, pillar should be according to design drawings, and to interchange, Bridges, channels, culverts, and as the locus of control, such as ranging positioning, can adjust the period of adjusting the spacing, and use the oddment allocation methods dealing with spacing.
(2), for the precise lofting and guarantee the fence line, segment for pile no. Review and closure.
(3), pillar lofting, should investigate the surface state of each pillar position, in case of underground communication pipe, drain, etc., or insufficient depth of a buried culvert top, should adjust some of the pillar position, change the column fixed way.
3, waveform guardrail installation
Column hole (1), according to the design drawing, and check with coordinated road alignment.
(2) basic information, such as shoulder allows, scoring method is used to set the vertical pile, construction should be accurate positioning, should to the design depth in column into the soil, when into too deep, not only will be post out to correct, and shall pull it all out, after waiting for foundation compaction scored again.
(3), pillar in difficulties, can use drilling method or excavation method column installation. Drilling method is used to install, support material should be the same as the roadbed backfill after positioning, and layered tamping dense filling; Excavation method is used to bury pillar, backfill soil should adopt good materials and hierarchical compaction (each layer thickness is not more than 15 cm), backfill soil compaction degree should not be less than the adjacent undisturbed soil.
(4), set in the structure of fence post, construction general in structure construction concrete base has been completed. Basis using the reserved hole, the hole should be remove sundries, sucking up water accumulation in the hole, will good asphalt coating in the bottom of a hole again, and then put into the post, control the elevation. You can note sand around the pillar. When sand filling must keep the correct position and verticality of the post. After the sand compaction, can use asphalt sealing, prevent the rain water leakage into the hole.
(5), in construction of asphalt pavement section of pillar, column pit from subgrade under the surface 5 cm use same as the roadbed backfill material and hierarchical compaction, the rest part adopts the same as the pavement material backfilling and compaction.
After 6, post installation in place, the horizontal direction and vertical direction to form a smooth line.
All landowners, the end of the gradual guardrail construction, should be stipulated in the design of the coordinates of the strict control of the pillar position, pay attention to the parabolic.
4, waveform girder installation
(1), the wave beam installation, through splice bolts joining together each other, and the connecting bolt is fixed on the column and beam. Wave beam splicing direction is the key to install, construction guarantee lap direction should be consistent with the direction.
(2), the wave beam during the installation process should be continuously adjusted, so the connection bolt and splice bolts should not be tighten too soon, so that during the installation process using waveform beam slotted hole to adjust in time, make it formed a smooth linear, avoid partial concave-convex.
(3), the wave beam top surface when installation should be coordinated with road vertical curve. And check the fence line, when determining the line is straight and smooth, may be the last screw down the bolt.
5, matters needing attention
ile in construction should be prepared to (1), section number to find accurate position. Layout should be accurate, error within the prescribed scope.
(2) pillar construction should strictly seriously, its verticality, spacing, bolt hole position should comply with the requirements, and other size is not in conformity with the requirement to rework immediately, and at the same time, should be strictly in accordance with JTJ074-94 norms for rework.
(3) wave beam, pillar of the component such as the packing and marking shall comply with the terms of GB6725. Purchase fence shall not be in bulk, and shall ensure that in the process of hoisting, transportation, stacking () not make the product deformation and damage. Should be fixed and reliable during the process of transportation, prevent due to turbulence or collision damage to the coating makes the deformation of the components.
(4) when the purchase note wave beam high-strength splice bolts connection of packing and marking shall conform to the relevant provisions of GB/T1231.
5 guardrail construction operations should be careful, and may not damage the pavement under the buried cables, pipes and garden fence www.jtwiremesh.com。


The collision of vehicles to its, because of the corrugated steelGuardrail plateGood performance and energy absorption

http://steelstructurewarehouse.blogspot.com/2013_09_01_archive.html







2013年9月5日星期四

Has not obtainedThe construction of theStarting and has not obtained a license without permission of pre-sale sales

Has not obtainedThe construction of theStarting and has not obtained a license without permission of pre-sale sales, property management enterprises to stop the realty service & hellip; & pvc coated wire fencing; These illegal behaviors will have a clear specification of finesstandard. Beijing housing and urban and rural construction committee recently released the first batch of administrative penalty discretionstandardInvolved,The construction of theLicense, property management, real estate development, commercial housing salesmanagement, etc., according to the illegal and harmful consequences and other considerations, clear on the fines for decided to apply standard and specifications.

Beijing is built appoint relevant controller introduces, the standard penalty discretion is to carry out the relevant requirements of the state council and the municipal government ShangWeiFa, regulating the administrative penalty discretion, raise the level of administrative law enforcement. Is also to strengthen the integrity, risk prevention, promoting reasonable law enforcement, the safeguard legitimate rights and interests, promote the need of administrative dispute resolving.

The release of the Beijing housing system of urban and rural construction administrative penalty discretion benchmark (a) (try out) ", a total of 17, is the first Beijing housing urban and rural construction system formulated by the administrative penalty discretion benchmark. The chief says, the city living building administrative penalty discretion benchmark system according to & other Mature one batch, introduced a batch & throughout; The principle of gradually introduced. The first batch of discretion benchmark, a total of 17, which involves the construction permits one, real estate development 2, 4 commercial housing sales, property management 10. Law enforcement in the administrative punishment, should fully consider the parties illegal facts, character, plot and the damage degree of the related factors, and press the discretion benchmark divided into 2 to 4 different discretion in gear, the corresponding punishment decision.

For example, the discretion standard, published for & other The construction unit has not obtained a construction license or work-start reports throughout the construction & without approval; Behavior, and according to the circumstances of the illegal consequences, put forward the four gear amount of different punishment standard; For & other; Do not conform to the conditions of commercial housing sales, real estate development enterprise to the buyer the YuDingKuan property fee & throughout; Behavior, according to the charging amount how many, has been clear about the from 10000 yuan to 30000 yuan of the three different punishment standard; For & other; Realty service enterprise to close the service & throughout; Behavior, and according to the circumstances of the illegal consequences, identified 10000 yuan, 50000 yuan, 100000 yuan 3 different punishment standard.

The official pointed out that the creation of discretion benchmark, implementation will be penalized to standardize law enforcement personnel to exercise discretion and pvc coated wire fencing www.jtwiremesh.com, risk prevention, promoting rational law enforcement, the safeguard legitimate rights and interests play a positive role in promoting.

Attachment: the Beijing housing urban and rural construction discretion benchmark system administrative penalty clause (a) (try out)"

If the single criterion for sintering and textlightThe steel structureReally don't have a uniformstandard

http://steelstructurewarehouse.blogspot.com/2013/09/if-single-criterion-for-sintering-and.html

2013年9月4日星期三

Of SNS side slope protective screening active defend net

Of SNS side slope protective screening active defend net, active protection fence panels in the most ordinary the most commonly used to GPS2 type of active network, active protection system is through the use of plant root system and the combination of welded fence, so as to restore the ecological environment, strengthen the slope stability and to promote the degradation of organic pollutants, purify air, reduce noise, a kind of environmental protection system. GPS2 SNS active fence type is the most commonly used in slope protection system is a product. Type: type GPS2 network: DO wire mesh SO / / 08/300 2.2/2.25 * 10.2 wire grille (tensile strength of 1770 mpa, breaking force & gt; 40 kn) support rope, & Phi; 16 system + anchor wire rope & Phi; Horizontal support line 16 + & Phi; 12 vertical support line suture line: & Phi; Eight main protection function: slope reinforcement, inhibition of collapse and weathering flake, slipped down, limiting part or a small amount of rockfall movement range, there are small pieces of falling rocks or soil slopes. Note: double layer mesh (wire rope net + steel grille), anchor length 2 m to 3 m, general pulling force of not less than 50 kn main structural configuration: welded fence www.jtwiremesh.com, wire rope, anchor rope and suture rope, steel wire grid network.

Guardrail plate must be good antirust processing

http://steelstructurewarehouse.blogspot.com/2013/09/guardrail-plate-must-be-good-antirust.html

2013年9月3日星期二

On November 3, 4 PM in pingluo county ma from yinchuan day panther company bus station bought A ticket 4:50 to central city XingRenZhen right

On November 3, 4 PM in pingluo county ma from yinchuan day panther company bus station bought A ticket 4:50 to central city XingRenZhen right, get on the bus after the ma found that the car is by yinchuan to lanzhou, passenger cars, car number for f * * * * * A. According to ma, get on the bus after I heard the conductor said to the driver, "pulled a XingRen, a silver, ten lanzhou." Driving the car parking along the way many times, and the car went fast and slow, in the process of ma feel the car was very uncomfortable, intent on hurry to the destination. That night around 7:40, conductor is called ma, ma out of the window a look, and chain link fencing car in the XingRen high-speed intersection, rather than a town. Ma said haven't to the destination, don't want to get off, and the driver to "ma mou one off at XingRen, highway uneconomic" citing ma out of the car. At this point, the night has come, ma had to climb over highway guardrail, but because it was so dark he accidentally fell down from the highway slope protection, was a stranger to XingRen hospital in a coma, and then transferred to the ningxia medical university general hospital. Through inspection, ma was diagnosed with ruptured spleen, stomach there is hemorrhage, need surgery to remove the spleen, at any time can have life risk. On November 5, the reporter understands to ningxia medical university general hospital, ma still in bed can't get up, and medical expenses have spent 15000 yuan. According to ma, after the fall, he and coach management company to negotiate compensation problem for many times, but have been rejected. Ma engaged in vehicle maintenance and chain link fencing www.jtwiremesh.com for cannot afford to continue the hospitalization expenses, has decided to go home rest. George's wife, told reporters after the ma can no longer be engaged in heavy manual labor, and at any time can have life risk.

Zhejiang quzhou high-speed highways brigade inspectors jiangshan export exchange platform in Beijing highway patrol

http://steelstructurewarehouse.blogspot.com/2013/09/zhejiang-quzhou-high-speed-highways.html

2013年9月1日星期日

No process, no false, real and durable wear resistant welded wire mesh Hype is the disadvantages of the network

No process, no false, real and durable wear resistant welded wire mesh Hype is the disadvantages of the network, a lot of really until become false, false to hype come true. Many consumers are confused in how to select the building materials online, I don't know what kind of chain link fencing www.jtwiremesh.com can be real to abrasion and corrosion resistance to oxidation. This request is not too much, because only good building materials to build a good building, such requirement shall be responsible for yourself, responsible for the whole building. Stainless steel mesh is the upgrade version of chain link fencing, its abrasion resistance, oxidation resistance, corrosion resistance is the sublimation of ordinary material mesh. Don't need to brag about, do not need to hype, used stainless steel mesh welders, welding engineering of building material is stainless steel mesh, all really good.

Mink cage - new mink cage price - mink cage craft anpingxian auspicious peak galvanized welded wire mesh

http://steelstructurewarehouse.blogspot.com/2013/09/mink-cage-new-mink-cage-price-mink-cage.html