2013年3月10日星期日

China steel framed structures enterprise need to change the old ideas


China steel framed structures enterprise need to change the old ideasThe 2011-6-20 8:16:06 along with the emergence of the steel structure housing system to now widely usedsteel structure engineeringIn the development of our country, although the steel structure of the cost is expensive, but in the face of the market for the enterprise, some old view needs to change.
The entry threshold is low, the technology content is not high, the profit is considerable, these factors make steel structure industry into our new factory, the steel structure industry competition intensified, a no smoke market race is a nationwide basis. Head-on, continuously improve the competitiveness of enterprises; Or complacent, satisfy the current situation,steel structure engineeringHas been a must directly face the problem. However, in the steel structure enterprise decision makers before a more pressing question is: enterprise want to long-term survival development go? Because in the long run, there may be not the so-called 'satisfy the current situation,' although will continue to increase the market cake, but they won't unrestricted growth down, together with the profound influence of the national macroeconomic regulation and control, a foreign company to massive intervention, and they plundered the trend of more and more fierce, strength is more and more strong, satisfy the current situation of the results can be its own market cake smaller and smaller, until the last can't maintain the normal operation of the enterprise - go bankrupt.
In fact, really want to lose the driving force of development enterprise decision maker is very few, most enterprise decision makers still want their own enterprise can base industry ever green, walk a sustainable development way. However, hope is not equal to reality, and often and reality has the very big disparity. The gap mainly comes from the enterprise the decision maker's own ideas, and is reflected in all aspects of management. Therefore, face to face with steel structure market rivals and the present situation, the enterprise decision makers to own enterprise to long-term sustainable development, we must first liberation of the old ideas, change malapropos ideas, to give yourself a necessary comprehensive 'brainwashing', to adapt to the changes of Chinese steel structure market, comprehensive enhancement enterprise's comprehensive competition strength.
Change the concept of employ: business talents, a win-win situation for this
Business development basic power is people. Human resource is a enterprise the most important resource, not capital, technology or equipment. The enterprise marketing need marketing elite, management needs management expert, money invested to master, the enterprise management of each link all needs matching talents, or enterprise is only a shell, unable to resist the market competition of disturbances. Private steel structure enterprise decision makers must be aware of this, and fundamentally and actual action up emphasis on human resources. In practical terms, the main should change the concept of employ.
First, 'there are people, money can come' idea. Many private enterprise decision makers think, as long as the rich can at any time and place in the talent market for enterprise development to the talented person, as a result of the existing personnel to the enterprise is not enough attention, and even the loss of talented people and things without serious or regrettable situation. In fact, every enterprise development for talents has its particularity, 'daughter easily, it is difficult to find a ", the enterprise to find and adapt to the development of their loyalty, high talent in fact is very difficult, although every day there are a large number of people looking for a job. Moreover, a not allow to ignore the objective fact is, at present China's overpopulation, but people never surplus, but very lack, many enterprises are difficult to (Internet).


Xinxiang chamber of commerce building steel frame



2013年3月8日星期五

steel truss design workshopIn China's development directionFor many years


steel truss design workshopIn China's development directionFor many years, our country some plant construction is mainly CuFangXing construction, some construction on the hand wet operation mode of production is given priority to, not only the productivity is low, the construction period is long, and high energy consumption and environmental pressure is big, some factory buildings, housing quality and performance to guarantee to realize the life cycle, and light steel structure workshop To solve the above problem, this steel structure workshop Form can not only to the user create more comfortable, safe use of space, and to improve plant construction quality and industrialization can play an important and positive role.steel structure workshopIn view of the economy, safety performance (earthquake, fire prevention) and durable performance comprehensive consideration, more and more enterprises plant developers turn in lightsteel structure workshop,steel structure workshopValue soon got generally recognized, steel structure construction market in the United States accounts for a great proportion, although different conditions, but also can seesteel structure workshopHas become the development direction of future plant.
With the rapid development of the national economy, people to meet the requirements of the building is more and more high, the safe, comfortable, healthy, green contour quality demand is more and more intense,steel structure workshopSatisfy the people's ideal workshop requirements, and at the same time, in recent years our country building, the policy has been to energy saving, industrialization as the guidance, therefore, under this background, our country has a lot of the relevant responsible persons have issued a series of promoting lightsteel structure workshopThe development of industrial policy support. In our country related conference, about propulsion plant industry modernization, improvesteel structure workshopQuality, offered to actively develop and popularize the use ofsteel structure workshop, officially recognized the building structure form, clearly set up the building energy saving earth, water saving, material saving, target,steel structure workshopBecome the new development of the new starting point.
At present, the domestic steel production enough, there are a number of lightsteel structure workshopConstruction experience and scientific and technological achievements,steel structure workshopDevelopment has a good material and technical base, will mark the our countrysteel structure workshopHas entered a new stage of development. In additionsteel structure workshopGenerally has the advantages of light weight, energy saving, durable, economic characteristics, if such a new environmental protection building materials, can a lot insteel structure workshopIn application, will soon achieve a low carbon building dream. (Internet)


Elaborate design of structural steel show four characteristics



2013年3月6日星期三

Do taking responsible for the Steel Roof Fabrication building

Do taking responsible for the Steel Roof Fabrication buildingAnd who Taking a run, run throughout the city and , do out of the PengCheng new scenery, advocate the low carbon new fashion. In order to reduce construction waste, most of the venues are using steel structure building.

Early summer season, in addition to overlay venues start construction and individual venues tense ending outside, 21 new dayun venues, 32 reconstruction venues were completed, and who Green crystal and throughout , and who Spring cocoon & throughout Jing, such as appearance. These once built will become a new landmark district of beautiful buildings, not only has a fashionable modern appearance, deduce architectural design, and the practice of the fine unsurpassed in shenzhen at the beginning of the taking and proposed cycle economy and people-oriented concept, cost-effective to show green low carbon economical and environmental protection of the beauty of the.

Crystal structure province out thousands of tons

In late April, DaTiLian invited participants of the competing countries to deep investigation venues construction, Canada head of delegation PeterBaxter were hesitated to take his cell phone to film taking center venues beauty, full of praise at the same time, he and many head, also can ask around, the swelling design will not waste material?

In fact, such questions as early as the beginning of taking a venue construction has been discussed in detail by the government. Shenzhen decision is, in the spirit of circular economy and the concept of people-oriented, shenzhen universiade all venues all green building design in accordance with the standard of construction, pay attention to project cost performance, for the core of the universiade ideas clearly for and who Simple, low carbon, green, vigor & throughout .

City construction works, deputy director of YeQian said, taking in the international center for the first time the who and Crystal and throughout Building modelling, roof steel structure building using domestic origination of single space folding surface grid structure, this structure is the most novel a structure form, the mechanical system, the complicated processing and installation as the Olympic Games and the difficulty of the who The bird's nest and throughout , the most direct value lies in saving steel quantity. With an area of 13.58 million square meters, the overall height 53 m stadium for example, by using steel 180000 tons, and who & The bird's nest and throughout Volume can not reach it two times, steel quantity but for 460000 tons, crystal structure province steel is obvious.

In fact, taking a center construction has been trying to reduce the heavy and complicated decoration cause unnecessary waste. Center all facade is used water concrete technology a pouring shape, don't do any paint, ceramic tile, etc decoration, durable, shorten the construction period, reduce pollution, maintenance cost is low, given the waste water lotus dayun center beauty.

Taking the design of the center of the German GMP President von & middot; Lattice kang, once touched the water concrete full of praise, think so of the construction process, quality the first, to promote the world.

Cool dazzle appearance that only this exquisite, energy, and save material structure of the natural reflected, contracted beauty perhaps so.

Natural ventilation guarantee venues cool

If you think and who Green crystal and throughout The hard enough and who Inside collect and throughout , it and who Spring cocoon & throughout Embodies round soft feelings. The iron and steel braided giant cocoon and & who Green crystal and throughout North and south echo, outdoor stadium, gymnasium and swimming pool care in the same a piece of roof, roof streamline modelling, fully show the characteristics of modern architecture. Two giant hall amazing architectural wonders at the same time, the question again, summer huge the cooling?

Summer long winter short shenzhen, the problem more let people care about. However, the practice of taking a green ones would have considered it.

Shenzhen perennial edom auster is given priority to, and who Spring cocoon & throughout Stylist is in the southeast, northwest toward the establishment of a large number of curtain wall open window to maximize into drafts, makes the northern and southern dynasties to the gym, swimming pool, tennis court and warm up library to make good use of the sea breeze, achieve energy saving purpose. Three way from head to look, and who Spring cocoon & throughout The ground than the municipal road surface more than two floors above, shenzhen bay sea breeze can easily and the hallway. Located in and who Spring cocoon & throughout Warm up the north hall and tennis court, although the binhai avenue and sports center clip in the middle, but due to the ground level to twenty meters, higher than the whole binhai avenue, natural ventilation.

From the watch, and who Spring cocoon & throughout The roof of the shape, only about 15% of the area of all exterior wall, roof transparent part is less than 20% of the area of the roof, can effectively reduce the roof area of direct sunlight, utmost avoid glass building & who Sun outside the dead, dead inside heat and throughout The situation.

Have the hot sun like fire in June, the citizen and who Spring cocoon & throughout Can still feel fresh sea breeze, appreciate the area outside the museum with camphor, etc.most of the sat and who Spring cocoon & throughout The platform, is to span 108 meters outlook bridge, as in the face of a huge picture viewing window, partition empty, HaiZhiMen looking outside, shenzhen bay thousands of waves, sipping fine sea gull, the mangrove forest, lining the distance of the New Territories, Hong Kong city scenery.

All transparent dayun center a two hall USES XIR laminated energy saving glass and polycarbonate plate tectonic double insulation, anti-glare system to guarantee the visible light transmittance over 70% of the premise, shielding 998% of infrared and ultraviolet ray, not only guarantees the venue illumination, and provide a high shading coefficient, realize a bright and who the Yin & throughout Cool effect.

As we have learned, such green technology in taking a venue construction can be found everywhere, the rainwater utilization, water reuse, water surface, wetland purification, solar photoelectric optothermal utilization, wind power utilization, intelligent green irrigation system, dry fog cooling facilities, air conditioning system energy saving, heat recovery and so on, there are 36 universiade venues completed green energy saving reconstruction, taking a seat more than fifty venues all is the modern green low carbon technology of steel structure buildings pavilion.

To this, the international DaTiLian vice President, Asia DaTiLian chairman ZhangXinSheng admiration: and who Shenzhen dayun venues construction in low carbon, environmental protection, green fields, such as walking in front. And throughout


building steel structure transformation and upgrading of the bottleneckAt present

Shenzhen bay sports center the mysterious veilmetal buildings

Shenzhen bay sports center the mysterious veilmetal buildings  again or high praiseYesterday, in all'm looking forward to, 2011 and who Mass cup and throughout Chinese table tennis open in shenzhen bay sports center and who Spring cocoon & throughout Grand opening. And who Spring cocoon & throughout To the public of the steel structure building was unveiled.

The audience in addition to the players superb skills offer warm applause, and who for Spring cocoon & throughout A beautiful beautiful posture and who TSK & throughout The ChenZanSheng.

According to the operations of the venue MoZhiYu introduces general secretary, yesterday to the audience of 120000 people. The audience in the appreciation of the players to consummate skills at the same time, also do not forget to appreciate the beautiful and graceful who Spring cocoon & throughout . Reporter in the stadium to see on the second floor of the platform, a big tree shaped round meshes from underground out into the air, outspread, spread into a giant network of paved wave and who The ceiling and throughout . Through the grid and who The ceiling and throughout , can see the blue sky, the sea breeze blowing slightly, comfortable and comfortable. Tourists in knots, the sea breeze in the left photo in spring cocoon figure.

According to introducing, shenzhen bay sports center by the Beijing architectural design institute and Japan sato comprehensive plan common design, the three main facilities and who A two hall and throughout In the south, integrated compact design, steel structure building of single layer reticulated shell space to form a whole, the stadium, gymnasium, swimming pool cover three major facilities in a roof, and the integration of the dynamic space, integrated into a new sports facilities. This design approach is the first, effectively improve the land use efficiency, keep the biggest, for the future development of outdoor land.

At the same time, this a two hall and unlike traditional venues, have closed walls, it is open, thing north and south four directions are fully openings, all can through the stretch of the gentle slope into easy, convenient and citizens, to the integration of man and nature. Especially the most eastern end, combined with the characteristics of the shenzhen bay near the sea, boldly and who Cutting & throughout A fully the profile, across more than 100 meters, like an open and who French window and throughout , so that the audience sitting in the stadium can see the sea, let & who Spring cocoon & throughout Be can see the sea of stadium.

building steel structure transformation and upgrading of the bottleneckAt present

2013年3月4日星期一

Residential use of the advantages of light steel structure building

Residential use of the advantages of steel structureThe 2011-7-1 8:12:36 in our country is the famous building of widely used steel structure building. As technology continues to mature and development, now a lot of buildings,light steel structure building Began to use and development of residential buildings.
The bird's nest, world expo stadium, the Oriental pearl TV tower, and hunan he long stadium, changsha wuhan-guangzhou passenger railway station, these are not new building, have a common and who Background & throughout & ndash; & ndash; Steel structure building. By the China construction metal structure association, hunan province housing and urban and rural construction, xiangtan jiu hua demonstration area management committee sponsored by the national construction steel structure industry conference in 9 to 10, held in changsha, the meeting proposed landmark project, in addition to outside and venues, construction steel structure should be in residential construction system comprehensively promote.
Steel structure building color plate PK concrete building
In may the opening of the Shanghai world expo, architectural use venue construction steel structure ratio reached 80%, China construction metal structure association deputy secretary-general YinMinDa introduction, steel structure with self-respect light, high strength, good seismic performance, and it is advantageous for the industrialization production characteristics, but also energy conservation and environmental protection, be able to recycle the use of building structure.
Due to the steel can be in the factory processing, steel made the room does not affected by bad weather, the use of steel structure building to speed up the time limit for a project, can save bank charges and the temporary rent, reduce the cost of building materials and personnel, etc. In building maintenance and transformation, steel column, metal casing and other steel structure parts can be easily removed, replacement and repair, therefore, steel structure designed for the Olympic Games, the world expo building built by a large number of use.
In the present domestic building, the new workshop, high-grade office buildings, stadiums, airport terminal and exhibition center application of steel structure building higher percentage.
Steel structure seismic will pull into the civil residence
However, and who 5.12 & throughout The earthquake, steel structure building good aseismatic function, to the steel structure to pull into the civil residence application field of vision. The personage inside course of study statistics, sichuan's portal frame light steel housing, few have collapsed in the quake, and the surrounding houses collapsed and damaged form bright contrast.
Along with the national construction of economical society the implementation of the strategic decision, the development of energy saving type land-saving residential more and more by the central and local governments pay attention to, Beijing, Shanghai, guangdong, zhejiang, etc were built a lot of lower, multi-layer and high-riseSteel structure housingThe pilot project, reflected Steel structure housingDevelopment of the good momentum.
Live a JianBu also organization and the steel structure housing system and key technology research, pilot projects, and on the steel structure housing design code ", in November formal implementation, for steel structure housing system in comprehensive spread out on the industry standard.
Experts believe that steel structure with green, energy-saving, environmental protection function, will become the trend of the development of housing construction in our country. Housing construction in our country gradually become the pillar industry of national economy.
Obviously, greater market space in civil building, it is a haven't lit and who Blue ocean & throughout . Use of construction steel structure, accord with two type society and who Resource conservation and throughout And and who Environment friendly and throughout Characteristics. Along with the national policy to expand domestic demand, the construction of two type society forward, will be for steel structure building provide broad market space and good development opportunity, steel structure construction market development prospects will be very broad.


An "the earth of the island" steel structures Australia construction near the end
http://chinasteelstructure.blogspot.com/2013/03/an-earth-of-island-steel-structures.html

2013年3月3日星期日

"Southwest first steel" lifting guangxi steel structure member industry domestic first-class


"Southwest first steel" lifting guangxi steel structure member industry domestic first-classRecently, in the south of guangxi aluminum on site, and who is known as The first beam and southwest throughout & ndash; & ndash; Section 4.858 meters high, 3.26 meters wide, single box girder 42 meters long and weigh up to 245 tons of steel, is slowly lift, and finally firmly in the assigned space. The success of the steel box girder hoisting, marks the guangxi in steel structure industry meet the domestic first-class level, has the sole for single weight more than 200 tons of large Non-standard Components FabricationManufacturing and installation capacity.Steel, also called steel box beam, long-span Bridges common structure form. Generally used in large span Bridges, because of its shape like a box girder is called. According to understand, this is a steel fangcheng port heavy industry co., LTD. (hereinafter referred to as a heavy industry) in south aluminium plate hot rolling workshopBuilding steel structureThe heaviest in engineeringNon-standard Components Fabrication, because of its span, quality and section size are particularly big, the structure is also special complex, far more than the same industryNon-standard Components Fabrication, in the industry for a large overweight, and is known as & who The first beam and southwest throughout .
Assistant to the general manager a heavy industry ZhangLi tells a reporter, medium thickness plate hot rollingBuilding steel structureEngineering steel quantity nearly 20000 tons, is China's C919 aircraft project and who To break the monopoly of foreign material supply to realize large aircraft material localization and throughout The core of the project, it is GuangXiOu liang level key project. Medium thickness plate hot rolling workshop project covers an area of 968.21 acres, with a total investment of 5.28 billion yuan, after the completion of the annual output of high performance air medium thickness plate 70000 tons, 170000 tons, other aluminum products used in the manufacture of large aircraft fuselage and wings and tail and skin, and other key parts, also used in ship industry, railway transport, automobile, petroleum chemical industry and container manufacturing, etc.
A heavy industry ZhuXuBin deputy general manager introduction, and who The first beam and southwest throughout The project is the core structure, all of the three sections of the steel production, fission transport to south aluminium installation site, the site after the whole spell a lifting.

Ten strong match commemorative sculpture disappeared 5 years reappearance shenyang steel structure construction
http://chinasteelstructure.blogspot.com/2013/03/ten-strong-match-commemorative.html

2013年3月1日星期五

Nanchang west railway station area B steel structure engineering lifting completion

Nanchang west railway station area B steel structure roofing lifting completionAfter forty days of continuous tension homework, China railway construction steel structure supplier (hereinafter referred to as the China railway construction steel structure) has successfully completed the nanchang west railway station area B steel structure roofing assembly task, to ensure that the main structure capped in early June laid a solid foundation. Nanchang west railway station is the mammal shanghai-kunming railway passenger special line and the important station, with a total construction area of 259015.1 square meters. Nanchang west railway station to the bayi colors as the theme, through abstract and strengthening, form building concise vivid image, full of movement, on the one hand, symbolic flag waving, on the other hand, float in the sky of electromotive force reflects the large railway traffic building character. After completion of the west railway station will bring together railway, subway, bus, social traffic and so on many kinds of transport mode to achieve a variety of organic link traffic.
Nanchang west railway station by station building outbound layer, platform layer, elevated waiting layer composition,steel structure engineering Main station building steel tube column, station building commercial sandwich and steel roof, no column canopy steel structure, etc. Station building steel column from the basement floor to ceiling level using steel tube concrete column; Station building commercial sandwich steel structure is located in elevated layers above 18.75 meters elevation, the pipe truss support concrete floor system, the largest span truss 25 meters, section maximum height 1.9 meters, the station building roof all adopt the nabla pipe truss structure system, truss maximum span of 61 meters, section height about 3 meters, peripheral roof overhang cantilever maximum size for eighteen meters. The canopy steel structure steel tube column support steel truss system, roof steel truss through the tree strut and cast steel nodes and steel column welding, brace for straight seam welded pipe. Y direction and the X direction primary and secondary truss staggered distribution, truss first quarter span arrangement circular tube rod, the largest span truss 42 meters, section height 2.3 meters.
Since the project construction began on March 25, since joining into the project staff to overcome the narrow construction site, and civil cross operation, truss hoisting mass, positioning accuracy, higher problem by subsection hoisting, door type temporary support, internal control combined with external control method, group step unloading construction plan, organization, fine management, in a hurry, spell speed, catch safety, the quality of weld ultrasonic testing a percent of pass is up to 100%, and safeguards the area B truss hoisting safety, high quality, and high efficiency successfully completed. (Internet)

steel structural green building situation good - "about to speed up our country to promote the development of green building in the implementation opinion"
http://chinasteelstructure.blogspot.com/2013/03/steel-structural-green-building.html